Trade Wizard features powerful TradingView charts to bring you the latest Bursa Malaysia stock pricing and market data. Sharpen your analysis with the TradingView platform — track market trends, follow global benchmarks like dow jones futures, and use robust tools to interpret price movements — all in one place.
The furniture manufacturing and trading segment recorded profit of RM4.73 million in FY2026 versus a loss of RM0.86 million in FY2025[1]. The prior-year loss was primarily attributable to recognition of deferred tax liabilities of RM4.10 million from asset revaluation and stock write-offs of RM1.75 million[1].
Property development swung to loss
The property development and construction segment recorded a loss of RM2.57 million in FY2026 versus profit of RM0.18 million in FY2025[1]. Rising material costs continued to impact operations, and the group remained selective in launching new projects given the sensitivity of affordable housing margins to material cost fluctuations[1].
Rental profit declined on higher costs
The rental segment's net profit decreased to RM0.18 million in FY2026 from RM0.81 million in FY2025[1]. This was attributed to increased upkeep and maintenance costs incurred during the year[1].
Data centre MOUs signed in August 2026
In August 2026, DPS signed non-binding MOUs with CEIG (M) Sdn Bhd for integrated energy infrastructure across Lendu and Bukit Rambai sites[1], and with BBSB Holdings for phased data centre capacity development of up to 89 MW with potential expansion to 400 MW[2]. Both MOUs are non-binding and mark the company's strategic entry into digital infrastructure[1][2].
DPS Resources is an investment holding company whose subsidiaries engage in property development and construction, furniture manufacturing and trading, and rental of buildings with comprehensive services, primarily in Melaka.
Read the full answer
DPS Resources Berhad operates through subsidiaries across three main business areas[1]. The property development and construction segment develops residential projects, including Taman Krubong Jaya Phase III launched in the last financial year[1]. The furniture manufacturing and trading segment produces and sells furniture products[1]. The rental segment provides building space with comprehensive services to tenants[1].
The company is expanding into digital infrastructure, developing a large-scale AI-driven data centre in Mukim Lendu, Alor Gajah, Melaka, spanning more than 300 acres with planned capacity of up to 500 MW[1]. The group also explores converting its 20-acre factory in Bukit Rambai into a data centre facility with planned capacity from 4 MW to 89 MW[2]. These projects leverage proximity to major highways, power infrastructure, fibre optic connectivity and the nearest submarine cable landing station[1].
How does DPS Resources make money?
DPS earns revenue from property development and construction (73% of FY2026 revenue), furniture manufacturing and trading, and rental of buildings with comprehensive services. FY2026 revenue was RM58.0 million.
Read the full answer
For the financial year ended 31 March 2026, DPS Resources generated revenue of RM58.0 million[1]. Property development services contributed RM10.3 million and construction services RM32.3 million, together representing 73% of group revenue[1]. The furniture manufacturing and trading segment contributed RM8.8 million[1]. Rental of buildings with comprehensive services provided RM9.9 million, while real estate contributed RM1.3 million
Which business segments performed better or worse for DPS Resources?
For FY2026, furniture rebounded strongly with profit of RM4.73 million versus a loss of RM0.86 million in FY2025, while property development recorded a loss of RM2.57 million versus profit of RM0.18 million in FY2025.
Read the full answer
The furniture manufacturing and trading segment performed best in FY2026, recording profit of RM4.73 million compared to a loss of RM0.86 million in FY2025[1]. The prior-year loss was primarily attributable to recognition of deferred tax liabilities of RM4.10 million from asset revaluation and stock write-offs of RM1.75 million[1].
The property development and construction segment recorded a loss of RM2.57 million in FY2026 versus profit of RM0.18 million in FY2025[1]
What were DPS Resources's latest quarterly results?
For the quarter ended 30 June 2026, DPS reported revenue of RM11.6 million (down 9.4% year-on-year), profit before tax of RM2.2 million (up 44.4%), and net profit of RM2.2 million (up 44.4%), with basic earnings per share of 0.84 sen.
Read the full answer
For the quarter ended 30 June 2026, DPS Resources reported revenue of RM11.6 million, a decline of 9.4% from RM12.8 million in the corresponding quarter of the prior year[1]. Despite lower revenue, profit before tax increased 44.4% to RM2.2 million from RM1.6 million, and net profit rose 44.4% to RM2.2 million[1]. Basic earnings per share were 0.84 sen, up from 0.59 sen[1].
Gross profit improved to RM4.0 million from RM3.7 million in the prior-year quarter, with gross margin calculated from the reported figures rising to 34.5% from 29.1%
Who owns DPS Resources?
As at 30 June 2026, the top shareholders were Maybank Nominees (14.36%), Affin Hwang Nominees (6.84%), Kenanga Nominees (5.68%), Public Nominees (5.61%) and AMSEC Nominees (5.11%). All are nominee accounts; beneficial owners are not disclosed in this snapshot.
Read the full answer
As at 30 June 2026, the largest shareholder on record was Maybank Nominees (Tempatan) Sdn Bhd holding 38,212,500 shares (14.36%)[1]. The second-largest was Affin Hwang Nominees (Tempatan) Sdn Bhd with 18,196,513 shares (6.84%)[1]. Kenanga Nominees (Tempatan) Sdn Bhd held 15,108,620 shares (5.68%), Public Nominees (Tempatan) Sdn Bhd (E-TMR/TMJ) 14,923,400 shares (5.61%), and AMSEC Nominees (Tempatan) Sdn Bhd 13,585,000 shares (5.11%)[1].
What major developments happened to DPS Resources recently?
In August 2026, DPS signed non-binding MOUs for data centre collaborations: with CEIG (a Fortune 500 Chinese state-owned company) for integrated energy infrastructure, and with BBSB Holdings for phased capacity development of up to 89 MW with potential expansion to 400 MW.
Read the full answer
On 14 August 2026, DPS Energy and subsidiary Shantawood entered a non-binding MOU with CEIG (M) Sdn Bhd, a subsidiary of Fortune 500 state-owned China Energy International Group Co. Ltd, to collaborate on data centres, renewable energy, power generation and water infrastructure in Melaka[1]. The Lendu project site spans approximately 345 acres with proposed capacity of 500 MW to 1 GW, including a Class F gas turbine power plant (500 MW expandable to 1.5 GW) and an 850-acre solar farm[1]. The Bukit Rambai site covers approximately 20 acres with 89 MW capacity and potential expansion to 400 MW, with indicative rental of USD130 to USD230 per kW and minimum 15-year tenancy[1]
What is DPS Resources's ESG and sustainability record?
DPS has established sustainability governance including a Code of Conduct and Whistleblowing Policy, appointed an Executive Director for sustainability management, and begun reporting greenhouse gas emissions. FY2026 total emissions were 1,188.44 tCO₂e, down from 1,613.69 tCO₂e in FY2025.
Read the full answer
DPS Resources has implemented a sustainability governance framework overseen by the board, with an appointed Executive Director responsible for sustainability management[1]. The company publishes sustainability statements in annual reports and has established a Code of Conduct and Ethics for all directors and employees, alongside a Whistleblowing Policy[1].
For FY2026, the company reported total greenhouse gas emissions of 1,188.44 tCO₂e, comprising Scope 1 (direct emissions from fuel) 23.81 tCO₂e, Scope 2 (electricity) 1,144.40 tCO₂e, and Scope 3 (employee commuting and business travel) 20.23 tCO₂e[1]
What are the main risks facing DPS Resources?
Main risks include possible delays in property project completion, fluctuations in raw material prices (particularly steel and diesel), property investment risks dependent on market conditions, exposure to political and regulatory changes, and force majeure events affecting construction sites.
Read the full answer
Project completion may be interrupted by unforeseen external circumstances beyond the company's control, resulting in cost overruns, negative feedback and legal uncertainties[1]. The group has sought and received extension of time for pandemic-related delays, though there is no assurance against future delays that may adversely impact earnings and reputation[1].
Raw materials including steel, industrial diesel, precast products, quarry products and ready-mix concrete are subject to price fluctuations, with diesel in particular a government-controlled item whose price floats weekly and may be affected by global market movements[1]
What does management say about DPS Resources's future outlook?
In the quarterly prospects note dated 26 May 2026, management states the board remains cautiously optimistic, driven by strategic initiatives to develop AI data centres and high-technology industrial park components in Melaka, aiming to position DPS as an emerging player in Malaysia's AI-driven digital infrastructure ecosystem.
Read the full answer
The board remains cautiously optimistic about the group's long-term prospects, driven by strategic initiatives to repurpose selected existing factory facilities into data centre operations and develop high-technology industrial park components in Melaka[1]. These initiatives are expected to position DPS Resources as an emerging player in Malaysia's AI-driven digital infrastructure ecosystem[1].
Management states the group is advancing development of a Mix Development / AI Data Centre and High-Tech Park in Mukim Lendu, Alor Gajah, planned with capacity of up to 500 MW[1]
Is DPS Resources's profit growing or declining, and why?
DPS's quarterly profit has been volatile. For the quarter ended 30 June 2026, net profit rose 44.4% year-on-year to RM2.2 million despite a 9.4% revenue decline, attributed by management to improved cost controls and operational efficiency in the furniture segment.
Read the full answer
DPS Resources' quarterly results show volatile profit. For the quarter ended 30 June 2026, net profit rose 44.4% to RM2.2 million from RM1.6 million in the prior-year quarter, despite revenue falling 9.4% to RM11.6 million from RM12.8 million[1]. Management attributes the profit increase to enhanced cost controls and operational efficiency, with the furniture segment contributing RM8.1 million revenue (up from RM0.4 million in the prior-year quarter) and segment profit of RM2.3 million[2].
The preceding quarter (31 March 2026) recorded a loss of RM1.7 million on revenue of RM13.0 million[3]
More questions about DPS Resources
Why did DPS Resources' FY2025 profit after tax appear so low at RM0.26 million?
FY2025's profit after tax of RM0.26 million was significantly affected by a one-off deferred tax expense of approximately RM4.13 million, mainly arising from recognition and reversal of temporary differences (RM1.23 million) and under-provision of deferred tax in prior years (RM2.92 million)[1]. This represented a one-off accounting adjustment that adversely affected reported profit and was not primarily attributable to underlying operating performance[1]. Excluding this tax adjustment, the group's operating performance remained relatively stable[1].
What is the status of DPS Resources' data centre MOUs signed in August 2026?
Both MOUs signed in August 2026 are non-binding[1][2]. The CEIG MOU is non-exclusive, valid for one year, and allows 30-day termination notice by either party, though it may be extended by mutual agreement[1]. The BBSB MOU has a 12-month term with 30-day termination notice[2]. Neither MOU constitutes a definitive agreement, and execution of binding agreements will depend on further due diligence, negotiations and board approvals[1][2].
How does DPS Resources calculate total borrowings in its gearing ratios?
Total borrowings used in DPS Resources' gearing calculations are bank and other borrowings, excluding lease liabilities[1]. Most companies report lease liabilities separately, and they are not included in the gearing figures calculated from the reported figures[1]. For the quarter ended 30 June 2026, total borrowings were RM52.1 million, and gross gearing calculated from the reported figures was 20.3%, being total borrowings divided by total equity of RM256.9 million[1].
Why does DPS Resources' trailing-four-quarter revenue differ from its financial year revenue?
The trailing-four-quarter totals cover the period from 30 September 2025 to 30 June 2026 and need not match the company's financial year[1]. DPS Resources' financial year ends 31 March, so the trailing four quarters shown (RM59.2 million revenue) span a different period from FY2026 (RM58.0 million revenue for the year ended 31 March 2026)[2][1]. Trailing four quarters are computed by code from quarterly reports and can differ from annual report full-year figures[1].
The property development segment focuses on affordable housing projects in Melaka[1]. The furniture segment manufactures and trades furniture products[1]. The rental segment leases buildings equipped with comprehensive services to tenants[1]. The company's emerging data centre initiatives aim to generate recurring income from capacity leases and colocation services[1][2].
. Rising material costs continued to impact operations, and the group remained selective in launching new projects given the sensitivity of affordable housing margins to material cost fluctuations
The rental segment's net profit decreased to RM0.18 million in FY2026 from RM0.81 million in FY2025, attributed to increased upkeep and maintenance costs[1]. Construction services contributed profit of RM0.33 million in FY2026 versus RM0.22 million in FY2025[1].
As at 30 June 2026, total assets stood at RM347.2 million, total equity RM256.9 million, and total borrowings RM52.1 million[1]. Gross gearing calculated from the reported figures was 20.3%[1]. The company did not declare a dividend for the quarter[1].
Other substantial holdings as at that date included MBSB Investment Nominees with 11,200,000 shares (4.21%) and RHB Nominees with 11,133,520 shares (4.18%)[1]. Among individual shareholders named, Chu Kim Guek held 3,735,087 shares (1.40%) directly[1]. Goldpeace Corporation Sdn Bhd held 1,769,900 shares (0.67%), Biotrend Estate Sdn Bhd 1,614,500 shares (0.61%), and Mutiara Mahajuta Sdn Bhd 1,914,380 shares (0.72%)[1]. These are snapshot holdings as at 30 June 2026 and may have changed since.
. The MOU is non-binding, non-exclusive, valid for one year with 30-day termination notice
On 12 August 2026, Shantawood signed a non-binding MOU with BBSB Holdings Sdn Bhd (a subsidiary of HKEX-listed BBSB International Limited) for phased data centre capacity lease of up to 89 MW with potential expansion to 400 MW[2]. Target delivery spans 2027 to 2030 across four phases totalling 89 MW[2]. The MOU has a 12-month term with 30-day termination notice[2].
. This represents a decrease from FY2025's total of 1,613.69 tCO₂e
The company acknowledges that its energy management practices are at an early stage and aims to enhance data collection, identify efficiency opportunities, and establish measurable performance indicators in future periods[1]. Water management initiatives include minimising waste through regular inspections and scheduled maintenance[1]. The company received no customer complaints during FY2026, FY2025 or FY2024[1]. The board does not yet measure sustainability KPIs in performance evaluations[1].
. Sustained increases in raw material prices or unavailability may adversely affect project profitability, though contractors generally price-in anticipated fluctuations in their tenders
Property investment risks depend on market conditions that can be affected by property overhang, economic downturn, difficulty in obtaining financing from financial institutions, interest rate trends and other unfavourable market conditions[1]. The company states that its focus on affordable housing makes sales generally more resilient than higher-end markets[1].
The property development industry is highly correlated to changes in political, economic and regulatory conditions[1]. Any adverse changes or uncertainties could adversely affect the group's operations and financial prospects, though management states its positioning in affordable housing is universally welcomed and such risks are minimal[1].
Operations conducted at construction sites may be affected by inclement weather conditions, natural disasters and other unavoidable accidents[1].
. The group has acquired 330 acres of land and completed a feasibility study with its appointed consultant
. The site benefits from proximity to a 275 kV PMU, existing high-voltage transmission pylons, fibre connectivity and proximity to the nearest submarine cable landing station
The group is also exploring conversion of its 20-acre factory in Bukit Rambai into a data centre facility with planned capacity from 4 MW to 89 MW[1]. A proposed upgrade to 275 kV capacity with potential state government support could enable larger-scale operations of up to 500 MW[1]. The collaboration with Invest Energy Ventures Sdn Bhd to develop a Centralised Utility Facility, solar farm and green energy infrastructure strengthens the sustainability profile[1].
. Management explains the loss was primarily due to lower contributions from property development and construction segments, alongside higher compliance-related development requirements representing necessary investment for future growth
For the trailing four quarters from 30 September 2025 to 30 June 2026, net profit totalled RM2.8 million on revenue of RM59.2 million, compared to nearly breakeven (RM-0.0 million) for the prior four quarters[1]. The annual report notes that FY2025's profit after tax of RM0.3 million was significantly affected by a one-off deferred tax expense of approximately RM4.13 million; excluding this adjustment, operating performance remained relatively stable[4].