Trade Wizard features powerful TradingView charts to bring you the latest Bursa Malaysia stock pricing and market data. Sharpen your analysis with the TradingView platform — track market trends, follow global benchmarks like dow jones futures, and use robust tools to interpret price movements — all in one place.
Revenue for the six months ended 30 June 2026 fell RM763.9 million to RM3.28 billion, primarily due to lower energy and capacity payments from Tanjung Bin Power Plant affected by steam turbine rotor failure at Unit 30 and hydrogen cooler leakage at Unit 20, and from Tanjung Bin Energy Plant following a fire incident in October 2025.[1][2]
Net profit declined 68% on lower contributions
For the trailing four quarters to 30 June 2026, net profit fell 68.3% to RM76.8 million from RM242.0 million, primarily due to lower contributions from Tanjung Bin Power Plant and Tanjung Bin Energy Plant affected by equipment failures and the fire incident, partially offset by insurance claims receivables and higher contribution from investments in associates.[1][2]
Renewable capacity grew four-fold to 766 MW
Renewable energy capacity expanded significantly to 766 MW in the financial year 2025 from 173 MW in 2024, reflecting progress on large-scale solar projects in Perak and Sarawak (570 MW secured), small hydropower plants in Kelantan, commercial and industrial rooftop solar (up to 61 MW), and the Sungai Udang waste-to-energy project groundbreaking in April 2026.[1][2]
Leadership transition following CEO's passing
Syahrunizam Samsudin was appointed Group CEO on 1 September 2025. Former Managing Director Anwar Syahrin Abdul Ajib passed away in late February 2026. Tan Sri Wan Zulkiflee Wan Ariffin became Independent Non-Executive Chairman on 1 March 2026, succeeding Tan Sri Che Khalib Mohamad Noh who stepped down after nearly 13 years.[1]
Malakoff Corporation Berhad operates power generation (coal-fired and gas-fired thermal plants, plus renewable energy projects including solar, hydropower and waste-to-energy), waste management and environmental services (municipal solid waste collection and disposal), electricity distribution in Sabah, district cooling systems, and operations and maintenance services for energy infrastructure in Malaysia and select foreign markets.
Read the full answer
Malakoff Corporation Berhad is an integrated energy and environmental services group operating primarily in Malaysia with select international operations.[1]
The company's power generation portfolio includes thermal plants, coal-fired facilities at Tanjung Bin in Johor and gas-fired plants at Segari in Perak and Prai in Penang, and a growing renewable energy portfolio that reached 766 MW capacity in the financial year 2025, up from 173 MW in 2024.[1] Renewable projects include large-scale solar in Perak and Sarawak (570 MW secured), small hydropower plants in Kelantan (commercial operation expected 2027), commercial and industrial rooftop solar installations (up to 61 MW), and a waste-to-energy plant in Sungai Udang, Melaka designed to process 1,056 tonnes of municipal solid waste daily and generate approximately 22 MW.[1][2]
The Environmental Solutions segment manages waste collection and disposal services, operating concessions and non-concession contracts across Malaysia.[1] The company also provides operations and maintenance services for power infrastructure, electricity distribution through its subsidiary in Sabah, district cooling systems, and project management services.[1]
How does Malakoff make money?
For the financial year 2025, Malakoff earned 73.2% of segment revenue from local power generation (energy and capacity payments under power purchase agreements), 13.5% from waste management and environmental services, 12.3% from other local operations (electricity distribution, district cooling, operations and maintenance services), and 1.0% from foreign operations.
Read the full answer
Malakoff generates revenue primarily through three business segments, based on the audited financial year 2025 figures.[1]
Power generation (73.2% of segment revenue) is the largest contributor, earned through power purchase agreements with Tenaga Nasional Berhad and other off-takers.[1] Thermal plants receive capacity payments (guaranteed revenue for plant availability) and energy payments (based on actual electricity dispatched). In 2025, energy income represented 61.2% of total revenue while capacity income accounted for 24.0%.
Which business segments performed better or worse for Malakoff?
For the financial year 2025, Malakoff's power generation segment declined due to lower payments from Tanjung Bin plants affected by equipment failures and a fire incident, partially offset by higher despatch from Segari and Prai. Revenue fell from RM8.97 billion in FY2024 to RM7.21 billion in FY2025. All three segments remained profitable in 2025.
Read the full answer
Malakoff reports three operating segments: power generation (local and foreign), waste management and environmental services (local), and others (local and foreign).[1]
Power generation experienced the most significant impact in the financial year 2025. Revenue fell primarily due to lower energy and capacity payments from Tanjung Bin Power Plant, affected by a steam turbine generator rotor failure at Unit 30 and generator hydrogen cooler leakage at Unit 20, and from Tanjung Bin Energy Plant following a fire incident in October 2025 involving the Flue Gas Desulphurisation facility and chimney tunnel.[2]
What were Malakoff's latest quarterly results?
For the quarter ended 30 June 2026, Malakoff reported unaudited revenue of RM1.91 billion, a decrease of RM109.6 million from the same quarter a year earlier, profit before tax of RM70.6 million, a decrease of RM14.4 million, net profit of RM34.6 million, down from RM70.9 million, and basic earnings per share of 0.65 sen. Total assets stood at RM18.60 billion and total borrowings at RM7.64 billion.
Read the full answer
For the quarter ended 30 June 2026, Malakoff reported unaudited quarterly results showing revenue of RM1.91 billion, a decrease of RM109.6 million or 5.4% from RM2.02 billion in the same quarter a year earlier.[1] Profit before tax was RM70.6 million, down RM14.4 million or 17.0% from RM85.0 million, while net profit fell RM36.3 million or 51.2% to RM34.6 million from RM70.9 million.[1] Basic earnings per share stood at 0.65 sen.[1]
Who owns Malakoff?
As at 17 February 2025, the largest shareholders of Malakoff were Bank Muamalat Malaysia Berhad (20.08%), MMC Corporation Berhad (18.37%), and Urusharta Jamaah Sdn. Bhd. (9.55% through a nominee account). Employees Provident Fund Board held 11.54% in total through various accounts. Tan Sri Dato' Seri Syed Mokhtar Shah Syed Nor held an indirect interest of 38.45%.
Read the full answer
As at 17 February 2025, Malakoff's shareholding structure showed Bank Muamalat Malaysia Berhad as the largest shareholder with 20.08%, followed by MMC Corporation Berhad with 18.37%.[1]
Urusharta Jamaah Sdn. Bhd. held 9.55% through Citigroup Nominees (Tempatan) Sdn Bhd, while Kumpulan Wang Persaraan (Diperbadankan) owned 7.72%.[1] Employees Provident Fund Board appeared through multiple nominee accounts: 7.58% under one Citigroup Nominees account and 3.46% under an Islamic account.[1]
What major developments happened to Malakoff recently?
Recent major developments for Malakoff include: securing a second reservation agreement in March 2026 for two M701JAC gas turbines for a new 1,400 MW plant in northern Peninsular Malaysia; a four-year power purchase agreement extension for Prai Power Plant to March 2030; groundbreaking in April 2026 for the Sungai Udang waste-to-energy plant in Melaka (22 MW capacity); and leadership transitions including the passing of Managing Director Anwar Syahrin Abdul Ajib in February 2026.
Read the full answer
On 2 March 2026, Malakoff entered into a second Reservation Agreement with Mitsubishi Power, Ltd. for two M701JAC gas turbines and gas turbine generators for a planned 1,400 MW gas-fired power plant in the north region of Peninsular Malaysia, part of the company's commitment to ensuring sufficient capacity as electricity consumption grows.[1]
On 9 March 2026, Prai Power Sdn. Bhd. executed a Power Purchase Agreement with Tenaga Nasional Berhad for a four-year extension of the Prai plant's operation, commencing 8 April 2026 and expiring 31 March 2030, reflecting continued confidence in the plant's operational stability and performance.[1]
What is Malakoff's ESG and sustainability record?
Malakoff aims to achieve net zero emissions by 2050 and targets 1,400 MW of renewable energy capacity by 2031. In the financial year 2025, renewable capacity grew from 173 MW to 766 MW. The company reported combined Scope 1 and Scope 2 emissions of 18.15 million tCO2e for its energy business and achieved over 98% compliance with air quality standards at Tanjung Bin Energy plant.
Read the full answer
Malakoff has committed to achieving net zero emissions by 2050 and set an interim target of 1,400 MW of renewable energy capacity by 2031.[1] In the financial year 2025, renewable energy capacity expanded significantly to 766 MW from 173 MW in 2024, reflecting progress on large-scale solar projects secured in Perak and Sarawak (570 MW total), small hydropower plants in Kelantan (commercial operation expected 2027), commercial and industrial rooftop solar (up to 61 MW), and the Sungai Udang waste-to-energy project.[1]
The company successfully carried out testing of 2% biomass co-firing at Tanjung Bin Power Plant under the National Energy Transition Roadmap in 2024.
What are the main risks facing Malakoff?
Malakoff identifies energy commodity price volatility, financing cost pressures, and emerging carbon pricing mechanisms as principal risks. The company states it manages these through prudent fuel procurement, engagement with regulators on tariff structures, diversified supplier relationships, and close monitoring of policy developments including the National Gas Roadmap expected in the third quarter of 2026. Climate-related physical risks to power plants are also registered in the enterprise risk framework.
Read the full answer
Malakoff faces material risks from energy commodity market volatility, with coal prices and liquefied natural gas costs remaining sensitive to geopolitical tensions, supply disruptions and trade patterns.[1] Domestic gas production has softened, heightening dependence on imported LNG and increasing exposure to global price movements.[1] Recent Middle East developments, including operational disruptions around the Strait of Hormuz, have impacted oil and LNG shipping and logistics.
What does management say about Malakoff's future outlook?
Management expects electricity demand to continue rising, particularly in areas with rapid digital infrastructure expansion. The quarterly prospects note filed 28 May 2026 states the company is on track to rebuild coal inventory following jetty repairs, has secured power purchase agreement extensions for its three gas-fired plants, and is advancing renewable energy projects including the Sungai Udang waste-to-energy plant and large-scale solar developments.
Read the full answer
In the quarterly prospects note filed 28 May 2026, management states that Malaysia's GDP grew 5.4% in the first quarter of 2026 (down from 6.3% in the fourth quarter of 2025), supported by household spending, steady investment and sustained export growth, particularly in electrical and electronics.[1] Bank Negara Malaysia expects 2026 global economic growth to expand at a more moderate pace, constrained by energy market disruptions, soaring oil prices and logistics bottlenecks from the ongoing Middle East conflict.[1]
Malakoff is on track to rebuild coal inventory at its Tanjung Bin plants, with the line C conveyor belt (capacity 5,000 tonnes per hour) having resumed operations on 8 March 2026 following repair of the collapsed coal unloader at the jetty; the remaining two conveyor belts were expected to commence operation by the end of the second quarter of 2026.
Is Malakoff's profit growing or declining, and why?
Malakoff's profit is declining. For the trailing four quarters to 30 June 2026, net profit fell 68.3% to RM76.8 million from RM242.0 million in the prior four quarters. The company states this was primarily due to lower contributions from Tanjung Bin Power Plant affected by steam turbine rotor failure and hydrogen cooler leakage, and from Tanjung Bin Energy Plant following a fire incident, partially offset by insurance claims receivables.
Read the full answer
Malakoff's profit has declined significantly over the past year. For the trailing four quarters ended 30 June 2026, net profit totalled RM76.8 million, a decrease of 68.3% from RM242.0 million in the prior four-quarter period.
The company attributes the decline primarily to operational disruptions at its two major coal-fired plants.[1][2] Tanjung Bin Power Plant experienced a steam turbine generator rotor failure at Unit 30 and generator hydrogen cooler leakage at Unit 20, resulting in lower capacity and energy payments.
More questions about Malakoff
Why did Malakoff report a pre-tax profit despite negative gross margins in one quarter?
For the quarter ended 31 December 2025, Malakoff reported a negative gross margin of -0.99% (gross loss of RM14.5 million) yet recorded profit before tax of RM175.7 million.[1] This reflects income from other sources beyond operating activities, including investment income from associates and joint ventures, finance income, and other non-operating gains that are added after gross profit in the income statement. The filings do not break down the specific components that turned the gross loss into a pre-tax profit.
Why does Malakoff's operating cash flow appear low compared to its quarterly profit?
Operating cash flow of RM116.8 million for the financial year to date ended 30 June 2026 is cumulative for the six-month period, while the quarterly profit figures of RM34.6 million and RM24.1 million are for single quarters.[1][2] Cash flow also includes working-capital movements (changes in receivables, payables and inventories) that do not appear in profit, so the two figures measure different things and should not be compared directly. The filings do not provide a detailed reconciliation of profit to operating cash flow.
What was the status of Malakoff's coal inventory rebuild at Tanjung Bin by mid-2026?
Management stated in the May 2026 prospects note that the company is on track to rebuild coal inventory at the Tanjung Bin Power and Tanjung Bin Energy plants.[1] Following repair of the collapsed coal unloader at the Tanjung Bin Complex jetty, the line C conveyor belt (capacity 5,000 tonnes per hour) resumed operations on 8 March 2026, with the remaining two conveyor belts expected to commence operation by the end of the second quarter of 2026.[1] The filings do not state the actual tonnage of coal inventory rebuilt by June 2026.
How does Malakoff's reported renewable energy capacity of 766 MW in 2025 relate to its 1,400 MW target by 2031?
Malakoff's renewable energy capacity grew from 173 MW in the financial year 2024 to 766 MW in 2025, representing 54.7% of its stated 1,400 MW target by 2031, calculated from the reported figures.[1] The 766 MW includes projects at various stages of development, not all of which are currently operational; the company describes them as reflecting continued execution of its renewable energy expansion strategy with projects progressing from development to operation over the interim period.[1] The filings do not specify which portion of the 766 MW is operational versus under development.
The Tanjung Bin Power Plant contributed 68.1% of energy income, Tanjung Bin Energy Plant 22.5%, Segari Energy Ventures 7.4%, and Prai Power Plant 2.0%.
Renewable energy projects generate revenue through feed-in tariffs and power sales agreements.
Waste Management and Environmental Services (13.5% of segment revenue) earns fees from municipal solid waste collection, disposal and management under concession agreements with state and local governments, plus non-concession cleaning contracts such as the two-year BERNAS rice warehouse cleaning contract in Sabah secured in early 2026.[1][2]
Other local operations (12.3% of segment revenue) include electricity distribution tariffs in Sabah, district cooling fees, operations and maintenance service contracts, and project management fees.[1] Foreign operations contributed 1.0% of segment revenue.[1]
The Tanjung Bin Energy plant resumed full operation on 28 January 2026 and the Tanjung Bin Power Plant's Unit 20 hydrogen cooler replacement was completed on 12 April 2026.
Waste Management and Environmental Services maintained profitability with steady performance.[1]
Others segment (including electricity distribution, district cooling, and operations and maintenance services) also remained profitable.[1]
For the six-month period ended 30 June 2026, group revenue decreased RM763.9 million compared to the same period in 2025, with the power generation segment's operational disruptions continuing to drive the decline.[1] For the full financial year 2025, revenue was RM7.21 billion compared to RM8.97 billion in 2024.[3]
Management attributed the lower revenue primarily to reduced capacity payments from Tanjung Bin Power Plant due to the steam turbine generator rotor failure at Unit 30 and generator hydrogen cooler leakage at Unit 20, partially offset by higher energy payments from Segari Energy Ventures and Prai Power Plant reflecting increased despatch factors.[1] The lower profit before tax resulted from reduced contribution from Tanjung Bin Power Plant due to the same equipment issues, partially offset by insurance claims receivables and higher contribution from investments in associates.[1]
The balance sheet as at 30 June 2026 showed total assets of RM18.60 billion and total equity of RM5.38 billion.[1] Cash and deposits stood at RM583.3 million, while total borrowings (excluding lease liabilities) amounted to RM7.64 billion.[1] Calculated from the reported figures, net gearing was 131.2% and the current ratio was 1.61 times.[1] Year-to-date operating cash flow reached RM116.8 million against capital expenditure of RM261.8 million.[1]
The substantial shareholders register shows Employees Provident Fund Board's combined direct interest at 11.54%.
Amanah Saham Bumiputera held 6.41%, Lembaga Tabung Haji 3.54%, and Amanah Saham Malaysia 2 – Wawasan 2.28%.[1]
The register of substantial shareholders (those holding 5% or more) lists Anglo-Oriental (Annuities) Sdn Bhd with a direct 20.08% interest, MMC Corporation Berhad with direct 18.37% and indirect 20.08%, Urusharta Jamaah Sdn Bhd with direct 9.55%, and Kumpulan Wang Persaraan (Diperbadankan) with direct 9.02%.[1]
Tan Sri Dato' Seri Syed Mokhtar Shah Syed Nor held an indirect interest of 38.45% through Seaport Terminal (Johore) Sdn Bhd and Indra Cita Sdn Bhd.[1]
Note that one investor can appear multiple times in the largest shareholders list through different nominee accounts, while the substantial shareholders register consolidates each holder's direct and indirect interests.[1]
On 2 April 2026, Malakoff hosted the groundbreaking ceremony for the Sungai Udang Waste-to-Energy plant in Melaka, a renewable energy project designed to process up to 1,056 tonnes of municipal solid waste per day and generate approximately 22 MW of gross renewable energy, aimed at reducing reliance on landfills.[1]
In early 2026, Genesis Facility Solutions Sdn. Bhd. secured a two-year cleaning service contract with Padi Beras Nasional Berhad for rice warehouse facilities across Sabah from 1 February 2026 to 31 December 2027.[1]
Following the collapsed coal unloader at Tanjung Bin Complex jetty, line C conveyor belt (capacity 5,000 tonnes per hour) resumed operations on 8 March 2026, with the remaining two conveyor belts expected to commence by end of the second quarter 2026.[1]
Leadership transitions included Syahrunizam Samsudin's appointment as Group CEO on 1 September 2025, the passing of former Managing Director Anwar Syahrin Abdul Ajib in late February 2026, and Tan Sri Wan Zulkiflee Wan Ariffin assuming the role of Independent Non-Executive Chairman on 1 March 2026 after Tan Sri Che Khalib Mohamad Noh stepped down.[2]
For the financial year 2025, the energy business reported total Scope 1 emissions of 18.09 million tCO2e (down from 20.40 million tCO2e in 2024) and Scope 2 emissions of 66,487 tCO2e (up from 64,770 tCO2e).[1] Combined Scope 1 and Scope 2 emissions totalled 18.15 million tCO2e, calculated from the reported figures. The environmental solutions business reported combined Scope 1 and Scope 2 emissions of 15,548 tCO2e, calculated from the reported figures.[1] The company commenced tracking of Scope 3 emissions for upstream transportation (coal), business travel and employee commuting in 2024 and 2025.[1]
Tanjung Bin Energy Power Plant demonstrated high overall compliance exceeding 98% with the Clean Air Regulations 2014 requirements for non-greenhouse gas emissions in 2025.[1] Community initiatives included the Jom Plogging: Saya Sayang Bumi clean-up and tree-planting program and educational outreach through the RISE and FIKS recycling facilities.[1]
The company employs prudent fuel procurement practices guided by continuous monitoring of global markets, prioritises operational reliability and plant efficiency to mitigate cost pressures, and engages closely with regulators to ensure tariff structures and concession terms appropriately reflect rising fuel-related costs.
The company monitors the National Gas Roadmap, expected to launch in the third quarter of 2026, to incorporate evolving gas supply policies into operational planning.
Financing conditions remain elevated with higher interest rates and selective credit availability influencing large-scale infrastructure investments.[1] The company states it maintains a resilient balance sheet and evaluates capital expenditure decisions carefully to preserve financial discipline.[1]
Malaysia's intention to introduce a carbon pricing mechanism in 2026 creates uncertainty, though the scope, rate and mechanism remain under discussion, with early indications suggesting initial application to selected heavy-emitting sectors.[1] The company states that without a confirmed structure, most industries have yet to incorporate internal carbon pricing, so near-term impact is likely to be indirect, shaping long-term project economics rather than immediate operational costs.[1]
Climate-related physical risks are registered in the enterprise risk management framework, including flooding, fire, geotechnical instability and extreme weather events that could disrupt operations and damage power plant infrastructure.[1] Climate-related transition risks arise from evolving policy and market responses to climate change, particularly exposure to carbon pricing mechanisms that may increase operating costs and influence asset competitiveness.[1]
The company secured extensions for its three gas-fired plants under the Energy Commission's Category 1 competitive bidding process, reaffirming the need for reliable baseload capacity amid growing national consumption, with the Prai Power Plant power purchase agreement extension running from 8 April 2026 to 31 March 2030.[1][2]
Renewable energy initiatives are advancing: the groundbreaking ceremony for the Sungai Udang waste-to-energy plant in Melaka was held on 2 April 2026, the company secured large-scale solar projects in Perak and Sarawak totalling 570 MW, and small hydropower plants in Kelantan are progressing towards commercial operation in 2027.[1][2]
In the Annual Report outlook statement dated 31 March 2026, management states that electricity demand is expected to keep rising, particularly in locations experiencing rapid digital infrastructure expansion, requiring carefully sequenced capacity additions, strengthened transmission networks and well-supported storage capabilities.[2] Investment decisions will continue to be guided by strategic relevance, sound economics and consistency with the company's role in providing stable, reliable supply.[2]
Tanjung Bin Energy Plant suffered a fire incident in October 2025 involving the Flue Gas Desulphurisation facility and chimney tunnel, leading to reduced energy and capacity payments.[2] The plant was fully restored and resumed operation on 28 January 2026.[2]
These negative impacts were partially offset by higher energy payments from Segari Energy Ventures and Prai Power Plant reflecting increased despatch factors, insurance claims receivables related to the equipment failures, and higher contribution from investments in associates.[1][2]
For the quarter ended 30 June 2026, unaudited net profit was RM34.6 million, down 51.2% from RM70.9 million in the same quarter a year earlier.[1] For the six-month period to 30 June 2026, revenue decreased 18.9% to RM3.28 billion from RM4.05 billion in the corresponding period of 2025.[1]