Trade Wizard features powerful TradingView charts to bring you the latest Bursa Malaysia stock pricing and market data. Sharpen your analysis with the TradingView platform — track market trends, follow global benchmarks like dow jones futures, and use robust tools to interpret price movements — all in one place.
Revenue for FY2026 reached RM169.03 million, a 36.7% increase from RM123.67 million in FY2025, driven by heightened construction activity across a larger portfolio of township infrastructure, earthworks and civil engineering projects, with the fortified order book providing strong revenue visibility and reaffirming the Construction Division as the principal growth engine.[1]
Profit swung to RM2.5 million loss
Despite robust revenue growth, the group recorded a loss before taxation of RM2.48 million in FY2026, contrasting with a profit before taxation of RM9.46 million in FY2025, predominantly driven by compressed margins on specific ongoing construction projects due to escalating raw material and diesel costs, together with higher depreciation charges from machinery fleet expansion (rising from RM4.01 million to RM11.52 million).[1]
Net gearing doubled to 0.60 times
Total loans and borrowings increased from RM50.17 million in FY2025 to RM90.35 million in FY2026 to fund project-related working capital, equipment financing and the execution of the active construction portfolio, causing the net gearing ratio, calculated from the reported figures, to rise from 0.31 times to 0.60 times as the growing order book necessitated increased working capital utilisation.[1]
RM305 million contracts secured post-year-end
In the three months following the FY2026 year-end, TSR Capital secured three major contracts: RM130 million for Kuala Lumpur-Karak Highway Package 2B (July 2026), RM16.9 million for Seremban earthworks (August 2026), and RM158 million for Selangor building works (September 2026), providing a robust foundation for the future growth trajectory.[1][2][3][4]
TSR Capital Berhad is a Malaysian construction and property development company with over 30 years of industry experience. The group executes township infrastructure, earthworks and civil engineering projects, and develops residential properties such as condominiums and town villas, operating across Selangor, Kuala Lumpur, Johor and other regions.
Read the full answer
TSR Capital Berhad is a construction and property development company listed on Bursa Malaysia Main Market since 2001, with over 30 years of industry experience.[1]
The group operates through two principal divisions. The Construction Division executes township infrastructure, earthworks and civil engineering projects, including highway expansion, industrial development, flood mitigation works, and integrated infrastructure packages.[1] The Property Development Division develops and sells residential properties such as condominiums and town villas, and maintains investment properties that generate recurring rental income.[1]
The company operates through seven wholly-owned subsidiaries, including TSR Bina Sdn Bhd (construction), TSR Ocean Park Sdn Bhd and TSR Development Sdn Bhd (property development), and holds a 40% stake in an associate, Pearl Boulevard Sdn Bhd (fully impaired).[1] Projects span Selangor, Kuala Lumpur, Johor, Negeri Sembilan and other regions across Malaysia.[1]
How does TSR Capital make money?
TSR Capital earns revenue primarily from construction contracts (85.0% of segment revenue in FY2026) for infrastructure, earthworks and civil engineering works, and from property development (14.6%) through sales of residential units and rental income from investment properties. The remaining 0.4% comes from other operating segments.
Read the full answer
For the financial year ended 30 June 2026, TSR Capital's revenue came from two main divisions, as reported in the audited Annual Report.[1]
Construction (85.0% of segment revenue): The Construction Division executes township infrastructure, earthworks and civil engineering projects under awarded contracts.[1] Revenue surged in FY2026, driven by heightened construction activity across a larger portfolio of projects including industrial development, township infrastructure, highway expansion and flood mitigation initiatives.[1]
Which business segments performed better or worse for TSR Capital?
In FY2026, TSR Capital's Construction Division generated 85.0% of segment revenue but recorded a loss before tax due to compressed margins from escalating raw material and diesel costs, together with higher depreciation from machinery fleet expansion. Property Development contributed 14.6% of revenue and remained profitable, with a small profit before tax.
Read the full answer
For the financial year ended 30 June 2026, the Construction Division generated 85.0% of total segment revenue but its profitability deteriorated significantly.[1] Management attributed this contraction to compressed margins on specific ongoing construction projects due to escalating project costs, particularly for raw materials and diesel.[1] Additionally, strategic investments to upgrade and expand the machinery fleet resulted in higher depreciation charges, which rose from RM4.01 million in FY2025 to RM11.52 million in FY2026.[1]
What were TSR Capital's latest quarterly results?
For the quarter ended 30 June 2026, TSR Capital reported revenue of RM63.1 million, an operating loss of RM5.8 million, a pre-tax loss of RM5.8 million, and a net loss of RM5.9 million (basic loss per share of 3.40 sen). Total assets stood at RM330.8 million and total borrowings at RM32.1 million.
Read the full answer
For the quarter ended 30 June 2026, TSR Capital's quarterly results showed revenue of RM63.1 million, up 60.7% year-on-year and 60.0% quarter-on-quarter.[1] However, the group recorded an operating loss of RM5.8 million, a loss before tax of RM5.8 million, and a net loss of RM5.9 million, with basic loss per share of 3.40 sen.[1] The gross margin, calculated from the reported figures, was 4.7%.[1]
Who owns TSR Capital?
As at 5 October 2026, Segi Satria Sdn. Bhd. was the largest shareholder with 29.38%, followed by Agur Tegap Sdn. Bhd. (10.31%) and Kencang Kuasa Sdn. Bhd. (7.98%). Tan Sri Dato' Lim Kang Yew held 1.72% directly and 29.38% indirectly through Segi Satria. Lim Dian Hoong and Spark Ace Sdn. Bhd. each held 29.38% indirectly.
Read the full answer
As at 5 October 2026, the top shareholders of TSR Capital were:[1]
Segi Satria Sdn. Bhd.: 51,258,018 shares (29.38%), the largest shareholder.[1]
What major developments happened to TSR Capital recently?
Since mid-2026, TSR Capital secured three major construction contracts: a RM130 million Kuala Lumpur-Karak Highway Package 2B (July 2026), a RM16.9 million Seremban earthworks contract (August 2026), and a RM158 million Selangor building works contract (September 2026). Mr Ng Kim Keong stepped down as Executive Director on 30 September 2026.
Read the full answer
New contracts: In July 2026, TSR Bina secured a RM130 million contract in joint venture for the construction and completion of earthworks and associated works (Package 2B) for the proposed widening of the Kuala Lumpur-Karak Highway.[1] In August 2026, the group accepted a RM16.9 million Letter of Award from MIE Industrial Sdn Bhd for site clearing and earthwork works in Seremban, Negeri Sembilan, with a four-month contract duration and scheduled completion in Q4 2026.[2] In September 2026, TSR Bina accepted a RM158 million contract from Perbadanan Kemajuan Negeri Selangor for infrastructure works.
What is TSR Capital's ESG and sustainability record?
In FY2026, TSR Capital began tracking Scope 1, 2 and selected Scope 3 greenhouse gas emissions, totalling 14,050.74 metric tonnes CO2-equivalent. The group reported no environmental non-compliance incidents or penalties. Total energy consumption rose to 56,182.65 MWh, and water consumption reached 52.64 megalitres, with no formal quantitative targets disclosed.
Read the full answer
TSR Capital's Sustainability Statement for FY2026 reported the following:[1]
Greenhouse gas emissions: In FY2026, the group began tracking its Scope 1 and Scope 2 GHG emissions and selected Scope 3 emissions in accordance with the GHG Protocol, reporting on an operational control basis.[1] Total emissions were 14,050.74 metric tonnes CO2-equivalent, comprising Scope 1 (13,495.66 tonnes from diesel and fleet vehicles), Scope 2 (216.07 tonnes from purchased electricity), and Scope 3 (339.01 tonnes from employee commuting).
What are the main risks facing TSR Capital?
TSR Capital faces margin compression from escalating raw material and diesel costs, higher depreciation from machinery fleet investments, and increasing working capital demands from a growing order book. The company states that the most severely impacted projects are nearing completion, and management maintains a focus on cost controls, productivity optimisation and margin protection.
Read the full answer
TSR Capital's Annual Report for FY2026 identifies the following business risks:[1]
Cost inflation and margin pressure: The group faced compressed margins on specific ongoing construction projects due to escalating project costs, particularly for raw materials and diesel.[1] This was the primary driver of the RM2.48 million loss before taxation in FY2026, contrasting with a RM9.46 million profit in FY2025.[1]
What does management say about TSR Capital's future outlook?
Management expects FY2027 to benefit from a substantially strengthened construction pipeline and greater revenue visibility, supported by RM130 million, RM16.9 million and RM158 million in new contracts secured post-year-end (July to September 2026). The group plans to execute projects with maximum efficiency, rigorously protect profit margins, maintain strict cash flow discipline, and advance Daya Residence Phase 2.
Read the full answer
The outlook statement in the Annual Report filed 28 October 2026 (which is newer than the latest quarterly prospects note) states the following:[1]
Management reported that TSR enters FY2027 with a substantially strengthened construction pipeline and greater revenue visibility.[1] Momentum has continued to accelerate into the new financial year: in July 2026, the group secured a RM130 million contract for Package 2B of the proposed Kuala Lumpur-Karak Highway widening project; in August 2026, a RM16.9 million contract for site clearing and earthworks for an industrial development in Seremban; and in September 2026, a major contract valued at approximately RM158 million for the construction and completion of building works in Selangor.
Is TSR Capital's profit growing or declining, and why?
TSR Capital's profit declined sharply in FY2026, swinging from a net profit of RM3.0 million in FY2025 to a net loss of RM3.2 million (basic loss per share of 1.83 sen versus earnings of 1.78 sen). The company attributes this to compressed margins from escalating raw material and diesel costs, and higher depreciation from machinery fleet investments.
Read the full answer
TSR Capital's profitability deteriorated significantly in the latest financial year. The trailing four quarters (2025-09-30 to 2026-06-30) recorded a net loss of RM3.4 million, compared to a net profit of RM3.0 million in the prior four quarters.[1] For the full financial year ended 30 June 2026, the audited Annual Report showed a net loss of RM3.2 million and basic loss per share of 1.83 sen, contrasting with a net profit of RM3.0 million and basic earnings per share of 1.78 sen in FY2025.[2]
The deterioration was most pronounced in the fourth quarter ended 30 June 2026, which recorded a net loss of RM5.9 million and basic loss per share of 3.40 sen, the largest quarterly loss in the reported data.
More questions about TSR Capital
Why does TSR Capital show different shareholdings for the same entity in the shareholder lists?
The list of largest shareholders counts each securities account separately, so one investor such as Wong Chooi Lin or Wan Ah Keow can appear multiple times through different nominee accounts.[1] The register of substantial shareholders adds up each holder's direct and indirect interest.[1] For example, Tan Sri Dato' Lim Kang Yew holds 1.72% directly and 29.38% indirectly through Segi Satria Sdn. Bhd.[1] The two lists use different bases and should not be added together.[1]
How does TSR Capital's operating cash flow compare to its reported profit for FY2026?
Operating cash flow of RM-1.0 million is cumulative for the financial year to 30 June 2026, while the quarterly profit figures shown in the results table are for single quarters, so the two should not be compared directly.[1] Cash flow also includes working-capital movements (such as changes in receivables, payables and inventory) that do not appear in the profit calculation.[1] The large negative operating cash flow in FY2026, despite positive profit in three of the four quarters, reflects the working capital demands of the expanding construction order book, as total loans and borrowings increased from RM50.17 million to RM90.35 million.[2]
What are the details of the RM158 million contract from Perbadanan Kemajuan Negeri Selangor secured in September 2026?
TSR Bina Sdn Bhd accepted a RM158 million contract from Perbadanan Kemajuan Negeri Selangor for infrastructure works in September 2026.[1] The Chairman's Statement describes it as a contract for the construction and completion of building works in Selangor.[2] The filings do not disclose the specific scope, project location, contract duration or expected completion date for this contract.[1][2]
Major contracts included the RM85 million Ibrahim Technopolis infrastructure package in Kulai, Johor; the RM48 million Bandar Bukit Raja Stage 3 infrastructure works; the RM99 million Kuala Lumpur-Karak Highway Package 1B; and the RM34 million East Coast Expressway flood mitigation contract.
Property Development (14.6% of segment revenue): This division generates revenue from the sale of residential properties, including condominiums and town villas, and recurring rental income from retained investment properties.[1] In February 2026, the group launched Daya Residence Phase 2 at Kwasa Damansara, featuring both condominium and town villa components.[1] PD Waterfront in Port Dickson continues to provide steady rental income.[1]
Other operating segments (0.4%) contributed a small portion and were loss-making.[1]
Management noted that the primary projects impacted by severe cost pressures were nearing completion by the financial year-end, and anticipates a progressive easing of these specific cost burdens.
The Property Development Division contributed 14.6% of segment revenue and remained profitable in FY2026.[1] In February 2026, the division launched Daya Residence Phase 2 at Kwasa Damansara, featuring both condominium and town villa components, building on the success of Phase 1.[1] PD Waterfront in Port Dickson continued to generate steady recurring rental income.[1]
Other operating segments (0.4% of revenue) were loss-making.[1]
As at 30 June 2026, total assets stood at RM330.8 million and total equity at RM147.9 million.[1] Cash and bank balances were RM4.6 million, while total borrowings (excluding lease liabilities) were RM32.1 million.[1] The current ratio, calculated from the reported figures, was 1.27 times.[1]
For the financial year to date (cumulative to 30 June 2026), operating cash flow was RM-1.0 million, and capital expenditure was RM0.9 million.[1] The filings do not disclose a dividend for this quarter.[1]
Management attributed the loss mainly to lower margins on certain ongoing projects arising from higher operating costs, specifically escalating raw materials and diesel prices.[1]
Kencang Kuasa Sdn. Bhd.: 13,916,622 shares (7.98%).[1]
The register of substantial shareholders listed Segi Satria Sdn. Bhd. (29.38% direct), Agur Tegap Sdn. Bhd. (10.31% direct), and Kencang Kuasa Sdn. Bhd. (7.98% direct).[1] Tan Sri Dato' Lim Kang Yew held 3,000,000 shares (1.72%) directly and 51,258,018 shares (29.38%) indirectly.[1] Lim Dian Hoong and Spark Ace Sdn. Bhd. each held 29.38% indirectly.[1]
These holdings are a snapshot at 5 October 2026 and will change after that date.[1] One investor can appear multiple times in the largest-shareholders list through different nominee accounts, so the two lists should not be added together.[1]
Board change: Mr Ng Kim Keong stepped down as Executive Director and Chief Operating Officer of TSR Capital Berhad, as announced on 30 September 2026.[4][5]
Annual General Meeting: The 25th Annual General Meeting is scheduled for 30 November 2026 at Menara TSR, Petaling Jaya, with resolutions including approval of Directors' Fees up to RM500,000 and Directors' Benefits up to RM50,000 for FY2027, re-election of three directors, and a change of external auditors from Crowe Malaysia PLT to Morison LC PLT.[5][6]
Shareholder mandates: A circular was issued seeking approval for the renewal of existing recurrent related party transaction mandates and a new mandate for TSR Bina to provide construction services to Tasja Sdn Bhd, estimated at RM80 million.[7]
Energy and water: Total energy consumption in FY2026 was 56,182.65 MWh (diesel 55,278.54 MWh, petrol 612.12 MWh, electricity 291.99 MWh).[1] Total water consumption was 52.64 megalitres.[1]
Compliance: During FY2026, there were no reported incidents of non-compliance with environmental laws and regulations, and the group did not incur any penalties, fines or stakeholder complaints relating to environmental compliance or directives from the Department of Environment.[1]
Workforce diversity: In FY2026, senior management comprised 90% male and 10% female; the executive category was 50% male and 50% female; non-executive employees were 87% male.[1] The board evaluation identified gender diversity as an area for improvement, with plans to identify suitable independent female director candidates.[1]
The filings do not disclose formal quantitative targets for emissions reduction, energy efficiency or water conservation.[1]
Management stated that the primary projects impacted by severe cost pressures were nearing completion by the financial year-end, and anticipated a progressive easing of these specific cost burdens.
Capital and liquidity demands: The growing order book necessitated increased working capital, leading to higher utilisation of banking facilities and financing arrangements.[1] Total loans and borrowings increased from RM50.17 million to RM90.35 million, and the net gearing ratio, calculated from the reported figures, rose from 0.31 times to 0.60 times.[1] Management stated that capital management priorities remain centred on maintaining robust liquidity to meet project obligations, supporting the execution of secured contracts, and preserving financial flexibility.[1]
Depreciation from fleet expansion: Strategic investments to upgrade and expand the machinery fleet resulted in higher depreciation charges, which rose from RM4.01 million in FY2025 to RM11.52 million in FY2026.[1] While these investments impacted short-term profitability, management stated they fundamentally enhance long-term execution capacity and operational flexibility.[1]
Management stated that the mandate moving forward is to translate growing scale into resilient, sustainable earnings.[1] The group plans to focus on executing projects with maximum efficiency, rigorously protecting profit margins, maintaining strict cash flow discipline, and selectively pursuing opportunities that offer an optimal balance between financial returns and execution risk.[1] Within the Property Development Division, management will actively advance Daya Residence Phase 2 while prudently evaluating new opportunities that align with sustainable market demand and long-term value creation.[1]
Management expressed deep confidence in the operational foundations established and stated that TSR is exceptionally well-positioned to capitalise on upcoming opportunities.[1]
Management attributed this contraction to compressed margins on specific ongoing construction projects due to escalating project costs, particularly for raw materials and diesel.[2][1] Additionally, strategic investments to upgrade and expand the machinery fleet resulted in higher depreciation charges, which rose from RM4.01 million in FY2025 to RM11.52 million in FY2026.[2] Management stated that the primary projects impacted by severe cost pressures were nearing completion by the financial year-end, and anticipates a progressive easing of these specific cost burdens going forward.[2]